Installation view of Herzog & de Meuron: In Focus at M+, Hong Kong, 2026

M+ opens Herzog & de Meuron archive to reveal the thinking behind ten Chinese projects

M+ in Hong Kong is marking its fifth anniversary with Herzog & de Meuron: In Focus, an exhibition that turns the architectural archive into a way of reading the built city. Open from 12 September 2026 to 10 January 2027 in the M+ Focus Gallery, the show follows ten projects in China from 2002 to 2021, including the museum itself, Tai Kwun and Beijing’s National Stadium.

More than 200 objects from the Basel practice’s second major donation to the M+ Collections bring the work into view at close range. Models, prototypes, sketches and archival material reveal decisions that are often hidden once a building is complete, tracing how Herzog & de Meuron’s projects respond to site, material and cultural context.

Installation view of Herzog & de Meuron: In Focus at M+, Hong Kong, 2026; photo by Wilson Lam
Installation view of Herzog & de Meuron: In Focus at M+, Hong Kong, 2026; photo by Wilson Lam
Installation view of Herzog & de Meuron: In Focus at M+; photo by Wilson Lam
Installation view of Herzog & de Meuron: In Focus at M+; photo by Wilson Lam
Study models and process materials for projects by Herzog & de Meuron; photo by Lok Cheng
Study models and process materials for projects by Herzog & de Meuron; photo by Lok Cheng

An archive arranged for discovery

The exhibition borrows its display language from the Kabinett, the architectural archive founded in 2015 by Jacques Herzog and Pierre de Meuron. Replicas of the archive’s wooden vitrines organise the works as an open store, inviting visitors to move between drawings, models and material samples rather than encounter the practice only through finished buildings.

The arrangement places process at the centre. Studies show how ideas change through testing and research, while the range of projects reflects the firm’s sustained engagement with China’s urban transformation and its civic and cultural institutions.

Exhibition display at Herzog & de Meuron: In Focus; photo by Wilson Lam

From M+ to the Bird’s Nest

Among the ten projects are M+ (2012–2021) and Tai Kwun (2006–2018), both in Hong Kong, alongside Beijing’s National Stadium (2002–2008), widely known as the Bird’s Nest. The exhibition places built work alongside unbuilt proposals, showing how the studio’s architectural language developed across different programmes and places.

Concept sketch for M+ by Jacques Herzog
Jacques Herzog concept sketch with plan and elevation for Beijing National Stadium
Study models and design prototypes for Beijing National Stadium; photo by Lok Cheng
Concourse with chandelier at Beijing National Stadium; photo by Iwan Baan

A fifth-anniversary donation

The new donation builds on Herzog & de Meuron’s 2023 gift of a section model of the National Stadium. Together, the collection and exhibition make the museum’s own architecture part of a broader conversation about how design connects buildings to people and place.

Installation view of Herzog & de Meuron: In Focus; photo by Wilson Lam

Project Credits

Exhibition: M+
Architecture firm: Herzog & de Meuron / @herzogdemeuron
Curator: Ikko Yokoyama, with Iris Ng
Photographers: Wilson Lam, Lok Cheng, Iwan Baan and Kevin Mak

Leave a reply

Loading Next Post...
Search
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...